Bayu Undan platform upgrade

26 Jun 2012

CCI successfully demonstrates pressure control on one of the longest subsea pipelines in the southern hemisphere by replacing a competitor valve with three 100D DRAG valves. The Bayu Undan platform now utilizes two ANSI 1500 pound, 18 inch valves and one ANSI 600 lb 20 inch valves. The platform supports gas transmission to the Darwin LNG plant where it is liquefied for export, and in working closely with ConocoPhillips will enable extended operating time and an increase to LNG production.

Valve on crane